
Megarope for gletscherjet funitel at kaprun
In view of the enormous strain this rope has been exposed to since then as a consequence of the great number of flexing cycles that occur on a funitel-type ropeway, it was necessary to replace it before the beginning of the winter season 2010/11. Again, the TEUFELBERGER was assigned the job of producing and delivering the replacement rope.
Download Success Story as a pdf.
